NEWSLETTER
Skip to product information
Vesgantti Queen Mattresses, 10 Inch Innerspring Hybrid Queen Size Mattress, Pressure Relief Pocket Spring Mattress in a Box with Breathable Memory Foam, Medium Firm, CertiPUR-US Certified
$329.98
Shipping calculated at checkout.
Details
About This
- 【Medium-Firm Plush Feel】- Fully expanded 59* 79*10 inch(LWH) approax. Vesgantti luxury mutilayer foam and pocket spring support systerm provide medium firm yet comfortable feel. A great relief for those suffering from back and neck pains
- 【Individual Pocket Spring】- Innovative zoned support system constructed by hundreds of individual pocketed stainless spring coils, each spring work independently to offer an all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebra well, help adjust and correct your sleeping posture
- 【Breathable and Healthy】- Designed with multi-layer foams, comfortable and breathable, providing good air circulation to dissipate sweat and moisture to keep body comfortable and dry when sleeping
- 【Ultra Quite】- Due to the pocket spring + multilayer foams design, this mattress can effectively absorb noise and vibration; No waken up caused by tossing and turning, no disturbing companion
- 【Vacuum Rolled Packed】- Delivery: vacuum sealed and neatly rolled in a box. Smaller size, easy to carry, restore in 10 seconds after unpacking, fully expanded for 72 hours. (Please note: once the mattress open and restore, it cannot be roll back again)
Overview
- Brand : Vesgantti
- Size : Queen
- Product Dimensions : 80"L x 60"W x 10"Th
- Top Style : Euro Top
- Cover Material : Polyester Blend
- Number of Layers : 3
- Fill Material : Memory Foam
- Weight Limit : 226.8 Kilograms
- Special Feature : Pressure Relief
- Color : Grey
- Item Weight 75 Pounds : Item Firmness Description Medium Firm
- : Item Weight 75 Pounds
- : Item Firmness Description Medium Firm
Materials + Care
We prioritize quality in selecting the materials for our items, choosing premium fabrics and finishings that ensure durability, comfort, and timeless appeal.
Shipping + Returns
We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.